Tree of Life
Sign in
Home
Clean a Room
Report a Cleaning Issue
Schedule
Orientation
Sign in
Checklist
Clean a Room
Home
Clean a Room
Cleaning
Boiler Room
Basement
Change room
Room
Choose from dropdown
Basement Kitchen - Basement
Basement Men’s Bathroom - Basement
Basement On Site Pantry - Basement
Basement Women’s Bathroom - Basement
Boiler Room - Basement
Clothing Prep Room - Basement
Clothing Room - Basement
Food Pantry Rooms - Basement
Social Hall - Basement
Social Hall Entryway - Basement
Social Hall Hallway - Basement
Youth Room - Basement
Back Classroom - First
Backstage - First
Community Room / Cafeteria - First
Front Classroom - First
Ramp Entryway - First
Sanctuary - First
Sanctuary Stage - First
Sprouts Entryway - First
Three Stall Bathroom - First
Upstairs Kitchen - First
Vending Closet - First
Vestibule - First
Courtyard - Outside
Dumpster - Outside
Admin Wing - Second
Admin Wing Bathroom - Second
Administrative Back Office - Second
Administrative Front Office - Second
Choir Loft - Second
Executive Office - Second
Front Stairwell / Blvd Side - Second
Green Room - Second
Green Room Bathroom - Second
Prayer Room - Second
Sprouts Admin Office - Second
Twigs Bathrooms - Second
Twigs Room - Second
Rear Stairwell / Chelton Side - Unknown
Prize Closet
Storage Room A
Storage Room B
Storage Room C
stage
Type to search or choose from the dropdown.
Contact details (optional)
Your name
Your email
Sign in
to attach your account to this cleaning.
Sign in
to see reports for this room.
Tasks
Select only the work you completed.
Task order
Most overdue
Cleaning flow
Tasks for Boiler Room
Other
5
Blow Down All 4 units on boiler
Last completed: 8 days ago (09-30 4:04 PM)
Instructions and help
Turn the valve for 10 seconds to let dark water out of boiler, then press reset button when complete. Only complete during the winter months.
Confirm ladder is put away
Last completed: 8 days ago (09-30 4:04 PM)
Instructions and help
Verify ladder is returned to its designated storage location and secured. Pathways should remain clear and safe.
Confirm floor is clear for easy boiler access
Last completed: 8 days ago (09-30 4:04 PM)
Instructions and help
Remove any stored items or clutter blocking the boiler access area. Leave a clear, safe working path to all boiler controls.
Visual inspection of the hot water tank
Last completed: 8 days ago (09-30 4:04 PM)
Instructions and help
Inspect the hot water tank area for visible leaks, unusual moisture, or obvious damage. Report any concern immediately through the issue report flow.
Sweep
Last completed: Never
Needs attention
Instructions and help
Sweep all accessible floor areas, corners, and edges to remove dust and debris. Collect and discard debris so the floor is clean and ready for use or mopping.
Surfaces
2
Disinfect light switches and door handles
Last completed: Never
Needs attention
Instructions and help
Disinfect all reachable light switches, door handles, and push plates with approved disinfectant. Surfaces should be visibly clean and dry to the touch.
Clean doors and door knobs
Last completed: Never
Needs attention
Instructions and help
Wipe door surfaces around handles and all knobs/push plates with approved disinfectant. Remove fingerprints and grime so touch points are visibly clean.
Other task completed
Check this when you completed something not listed above.
Notes (optional)
Other actions
Report an issue
No tasks selected yet
Submit Checklist